Data to …… trials

Record b846c4f6fab042a8906226b798901779

PASS

Verdict and provenance first; raw prompt/response/reasoning below, collapsed.

✓PASSanswered "]" · model Nemotron 3 Super 120B

finish_reason: stop · tokens in/out: 780/1115 · cost: $0.000564 · latency: 5791.7 ms

tool_plantemplatestop

verifier_detail: kind=tool_plan;campaign=1;traps=id_collisions_on=1;detail=goal_reached;n_calls=7;optimal_depth=7;overhead=0

trap kind(s) this world was seeded for: id_collisions_on=1

lineage: b846c4f6

← prev trial · trial 71 of 91 · next trial →

Prompt 2,907 chars · 780 tokens in
You are an operations planner. Below is the current state of a small deployment environment, a goal, and a catalog of tools you may call. Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails.
CURRENT STATE:
- notifier-0 is currently down (not yet provisioned).
- gateway-1 is currently down (not yet provisioned).
- The release-image artifact does not exist yet.
- The db-migration artifact does not exist yet.
- The maintenance_window_open flag is off.
- The secrets_synced flag is off.

GOAL (all conditions must hold at the end):
- service 'notifier-0' must reach at least the 'healthy' state

ENTITY IDS (use these exact ids in your tool args):
Services: svc_0 (notifier-0), svc_1 (gateway-1)
Artifacts: art_0 (release-image), art_1 (db-migration)
Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced)

TOOL CATALOG:
- id: adva_nce_1 | name: configure | params: service: service
    Configure a service, moving it from 'provisioned' to 'configured'. Precondition: the service must currently be 'provisioned'.
- id: dec-oy_1 | name: warm_cache | params: service: service
    Warm the cache for a service (best-effort, no state change). (Has no effect on deployment state.)
- id: advance_o2 | name: deploy | params: service: service
    Deploy a service, moving it from 'configured' to 'deployed'. Precondition: the service must currently be 'configured'.
- id: advance_o0 | name: provision | params: service: service
    Provision a service, moving it from 'down' to 'provisioned'. Precondition: the service must currently be 'down'.
- id: publis-h_art_0 | name: publish_artifact | params: artifact: artifact
    Publish the art_0 artifact (moves it from 'built' to 'published'). Precondition: the artifact must be 'built'.
- id: dec_oy_0 | name: audit_logs | params: service: service
    Audit the log stream for a service (read-only). (Has no effect on deployment state.)
- id: build_art_0 | name: build_artifact | params: artifact: artifact
    Build the art_0 artifact (moves it from 'absent' to 'built'). Precondition: the artifact must be 'absent'.
- id: advance_o3 | name: health-check | params: service: service
    Health-check a service, moving it from 'deployed' to 'healthy'. Precondition: the service must currently be 'deployed'. Requires the flag_0 flag to be set. Requires the art_0 artifact to be published.
- id: set_flag_o0 | name: set_flag | params: flag: flag
    Set the flag_0 flag to true. Precondition: it must currently be false.

Output ONLY a JSON array of tool calls that, executed in order from the current state, satisfies the goal. Each element must be an object {"tool": "<tool id>", "args": {"<param>": "<entity id>", ...}}. Do not include any prose, explanation, or markdown fences -- just the JSON array.

You may use at most 14 tool calls.
Response 1,115 tokens out · finish: stop

[
  {"tool": "advance_o0", "args": {"service": "svc_0"}},
  {"tool": "adva_nce_1", "args": {"service": "svc_0"}},
  {"tool": "advance_o2", "args": {"service": "svc_0"}},
  {"tool": "set_flag_o0", "args": {"flag": "flag_0"}},
  {"tool": "build_art_0", "args": {"artifact": "art_0"}},
  {"tool": "publis-h_art_0", "args": {"artifact": "art_0"}},
  {"tool": "advance_o3", "args": {"service": "svc_0"}}
]
Reasoning 3,585 chars
Model reasoning
We need to produce a sequence of tool calls leading to notifier-0 healthy.

Current state:

- Services: notifier-0 (svc_0) is down. gateway-1 (svc_1) down.
- Artifacts: release-image (art_0) absent? Actually says does not exist yet => absent. db-migration also absent.
- Flags: maintenance_window_open (flag_0) off (false). secrets_synced (flag_1) off.

Goal: notifier-0 must be at least healthy.

To get healthy we need to run health-check on notifier-0 which moves from deployed to healthy, requires flag_0 true and artifact art_0 published.

Thus steps:

1. Provision notifier-0 (svc_0): move down -> provisioned using provision tool (advance_o0).

2. Configure notifier-0: configured via configure (adva_nce_1).

3. Deploy notifier-0: deployed via deploy (advance_o2).

But before health-check we need flag_0 set true and artifact art_0 published.

Flag setting: set_flag_o0 sets flag_0 true (requires currently false). So after some point we can set flag.

Artifact publishing: Need to build artifact then publish.

Build artifact art_0: build_artifact (build_art_0) from absent to built.

Publish artifact art_0: publish_artifact (publis-h_art_0) from built to published.

Now health-check: health-check (advance_o3) on service svc_0, requires flag_0 true and artifact art_0 published.

Thus overall sequence:

- provision svc_0
- configure svc_0
- deploy svc_0   // now deployed but not healthy because missing flag/published artifact?
Actually health-check will later transition from deployed to healthy if prerequisites satisfied. We could do health-check after building/publishing artifact and setting flag.

So maybe better ordering: After deploying, we still need to set flag, build artifact, publish artifact, then health-check.

Let's list steps with tool IDs:

Provision: advance_o0 (id?) Wait check tool list: There's "advance_o0" named "provision". Yes.

Configure: adva_nce_1 (name configure). Note spelling: "adva_nce_1".

Deploy: advance_o2 (name deploy).

Set flag: set_flag_o0 (name set_flag).

Build artifact: build_art_0 (name build_artifact).

Publish artifact: publis-h_art_0 (name publish_artifact). Note hyphen.

Health-check: advance_o3 (name health-check).

Check each precondition:

- provision: service must be down. Initially svc_0 down, ok.

- configure: service must be provisioned. After provision, svc_0 provisioned, ok.

- deploy: service must be configured. After configure, ok.

- set_flag: flag must be false. Initially false, ok anytime before we set true.

- build_artifact: artifact must be absent. Initially absent, ok.

- publish_artifact: artifact must be built. After build, ok.

- health-check: service must be deployed. After deploy, ok. Also requires flag_0 true (set) and artifact art_0 published (after publish). So we need to ensure those done before health-check.

Thus final step health-check.

Potential extra steps: Not needed to touch gateway-1 or other artifacts/flags.

Sequence length: 7 steps.

Make sure to use correct entity IDs in args.

Tool definitions:

- advance_o0: params: service: service. Args: {"service": "svc_0"}.

- adva_nce_1: params: service: service. Args: {"service": "svc_0"}.

- advance_o2: params: service: service. Args: {"service": "svc_0"}.

- set_flag_o0: params: flag: flag. Args: {"flag": "flag_0"}.

- build_art_0: params: artifact: artifact. Args: {"artifact": "art_0"}.

- publis-h_art_0: params: artifact: artifact. Args: {"artifact": "art_0"}.

- advance_o3: params: service: service. Args: {"service": "svc_0"}.

All good.

Return JSON array.

Check max 14 calls, we have 7.

Thus answer.
Realized dims 13
dimvalue
catalog_size9.0
chain_length3.0
decoy_count2.0
dishonest_decoys_on0.0
id_collisions_on1.0
implicit_preconditions_on0.0
irreversibility0.0
parallel_goals1.0
plan_overhead0.0
poison_traps0.0
realized_plan_depth7.0
state_obscurity0.0
zero_slack_on0.0
Latent params 11
paramvalue
decoy_tools2.0
dishonest_decoys_on0.0
id_collisions_on1.0
implicit_preconditions_on0.0
irreversibility0.0
parallel_goals1.0
plan_depth4.0
poison_traps0.0
precondition_chain1.0
state_obscurity0.0
zero_slack_on0.0