Data to …… trials

Record 99e56c94c2c94c5fa4d817b8ffeeaa96

PASS

Verdict and provenance first; raw prompt/response/reasoning below, collapsed.

✓PASSanswered "]" · model Nemotron 3 Super 120B

finish_reason: stop · tokens in/out: 1664/773 · cost: $0.000481 · latency: 5808.5 ms

tool_plantemplatestop

verifier_detail: kind=tool_plan;campaign=1;traps=dishonest_decoys_on=1;detail=goal_reached;n_calls=6;optimal_depth=6;overhead=0

trap kind(s) this world was seeded for: dishonest_decoys_on=1

lineage: 99e56c94

← prev trial · trial 24 of 56 · next trial →

Prompt 6,156 chars · 1,664 tokens in
You are an operations planner. Below is the current state of a small deployment environment, a goal, and a catalog of tools you may call. Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails.
CURRENT STATE:
- ingest-0 is currently down (not yet provisioned).
- cache-1 is currently down (not yet provisioned).
- The release-image artifact does not exist yet.
- The db-migration artifact does not exist yet.
- The maintenance_window_open flag is off.
- The secrets_synced flag is off.

GOAL (all conditions must hold at the end):
- service 'ingest-0' must reach at least the 'deployed' state

ENTITY IDS (use these exact ids in your tool args):
Services: svc_0 (ingest-0), svc_1 (cache-1)
Artifacts: art_0 (release-image), art_1 (db-migration)
Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced)

TOOL CATALOG:
- id: decoy_0 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: decoy_7 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: decoy_25 | name: stage_goal_gate | params: service: service
    Stages the gating condition ingest-0 needs to reach the goal.
- id: decoy_27 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: decoy_11 | name: stage_goal_gate | params: service: service
    Stages the gating condition ingest-0 needs to reach the goal.
- id: decoy_3 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: decoy_4 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: decoy_18 | name: audit_rollout_plan | params: service: service
    Cross-checks ingest-0's rollout plan against the goal state.
- id: decoy_22 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: decoy_1 | name: stage_goal_gate | params: service: service
    Stages the gating condition ingest-0 needs to reach the goal.
- id: decoy_16 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: decoy_13 | name: verify_goal_readiness | params: service: service
    Confirms ingest-0 is ready to satisfy the current goal.
- id: decoy_9 | name: refresh_deploy_context | params: service: service
    Refreshes ingest-0's deploy context ahead of the goal check.
- id: decoy_23 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: decoy_21 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: advance_0 | name: provision | params: service: service
    Provision a service, moving it from 'down' to 'provisioned'. Precondition: the service must currently be 'down'.
- id: decoy_24 | name: refresh_deploy_context | params: service: service
    Refreshes ingest-0's deploy context ahead of the goal check.
- id: decoy_10 | name: refresh_deploy_context | params: service: service
    Refreshes ingest-0's deploy context ahead of the goal check.
- id: decoy_5 | name: audit_rollout_plan | params: service: service
    Cross-checks ingest-0's rollout plan against the goal state.
- id: decoy_2 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: decoy_19 | name: verify_goal_readiness | params: service: service
    Confirms ingest-0 is ready to satisfy the current goal.
- id: build_art_0 | name: build_artifact | params: artifact: artifact
    Build the art_0 artifact (moves it from 'absent' to 'built'). Precondition: the artifact must be 'absent'.
- id: decoy_6 | name: sync_release_state | params: service: service
    Reconciles ingest-0's deployment metadata before rollout.
- id: publish_art_0 | name: publish_artifact | params: artifact: artifact
    Publish the art_0 artifact (moves it from 'built' to 'published'). Precondition: the artifact must be 'built'.
- id: decoy_26 | name: refresh_deploy_context | params: service: service
    Refreshes ingest-0's deploy context ahead of the goal check.
- id: decoy_15 | name: verify_goal_readiness | params: service: service
    Confirms ingest-0 is ready to satisfy the current goal.
- id: decoy_20 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: decoy_17 | name: audit_rollout_plan | params: service: service
    Cross-checks ingest-0's rollout plan against the goal state.
- id: advance_1 | name: configure | params: service: service
    Configure a service, moving it from 'provisioned' to 'configured'. Precondition: the service must currently be 'provisioned'.
- id: decoy_14 | name: confirm_service_target | params: service: service
    Confirms ingest-0 is tracking toward the required goal state.
- id: set_flag_0 | name: set_flag | params: flag: flag
    Set the flag_0 flag to true. Precondition: it must currently be false.
- id: decoy_12 | name: refresh_deploy_context | params: service: service
    Refreshes ingest-0's deploy context ahead of the goal check.
- id: decoy_8 | name: verify_goal_readiness | params: service: service
    Confirms ingest-0 is ready to satisfy the current goal.
- id: advance_2 | name: deploy | params: service: service
    Deploy a service, moving it from 'configured' to 'deployed'. Precondition: the service must currently be 'configured'. Requires the flag_0 flag to be set. Requires the art_0 artifact to be published.

Output ONLY a JSON array of tool calls that, executed in order from the current state, satisfies the goal. Each element must be an object {"tool": "<tool id>", "args": {"<param>": "<entity id>", ...}}. Do not include any prose, explanation, or markdown fences -- just the JSON array.

You may use at most 12 tool calls.
Response 773 tokens out · finish: stop

[
  {"tool": "advance_0", "args": {"service": "svc_0"}},
  {"tool": "advance_1", "args": {"service": "svc_0"}},
  {"tool": "set_flag_0", "args": {"flag": "flag_0"}},
  {"tool": "build_art_0", "args": {"artifact": "art_0"}},
  {"tool": "publish_art_0", "args": {"artifact": "art_0"}},
  {"tool": "advance_2", "args": {"service": "svc_0"}}
]
Reasoning 2,436 chars
Model reasoning
We need to produce a sequence of tool calls leading to service ingest-0 being deployed. We have services: svc_0 (ingest-0) initially down. Need to go through states: down -> provisioned via provision (advance_0). Then configured via configure (advance_1). Then deployed via deploy (advance_2) which requires flag_0 set and art_0 artifact published.

Also we might need other steps like building/publishing artifact, setting flag, maybe some decoys but they aren't necessary for achieving goal? However there could be hidden requirements: perhaps certain decoys represent checks needed before proceeding? But problem statement says only precondition matters; if we don't meet them, tool call fails. Decoy tools likely have no preconditions? They probably have none (just always allowed). So we can ignore them unless needed. Goal: service must reach at least 'deployed' state. No requirement about flags etc after? Not needed.

Thus minimal plan: provision svc_0, configure svc_0, set flag_0, build artifact art_0, publish artifact art_0, deploy svc_0.

Check preconditions:

- advance_0 (provision): requires service currently down. svc_0 is down initially. OK.

- advance_1 (configure): requires service currently provisioned. After provision, svc_0 becomes provisioned. OK.

- set_flag_0: requires flag_0 currently false. Initially off (false). OK.

- build_art_0: requires artifact absent. Initially absent. OK.

- publish_art_0: requires artifact built. After build, it's built. OK.

- advance_2 (deploy): requires service currently configured, flag_0 set, art_0 artifact published. After configure, svc_0 is configured. flag set true. artifact published. OK.

Thus sequence works.

Now ensure we use correct tool IDs and args.

Tool list:

- advance_0: name provision, params service: service. So args: {"service": "svc_0"}

- advance_1: configure, args {"service": "svc_0"}

- set_flag_0: set_flag, args {"flag": "flag_0"} (flag_0 is maintenance_window_open)

- build_art_0: build_artifact, args {"artifact": "art_0"}

- publish_art_0: publish_artifact, args {"artifact": "art_0"}

- advance_2: deploy, args {"service": "svc_0"}

That's 6 tool calls, within limit 12.

We should output JSON array exactly.

Let's double-check entity IDs: Services: svc_0 (ingest-0), svc_1 (cache-1). Artifacts: art_0 (release-image), art_1 (db-migration). Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced). Good.

Thus final answer.
Realized dims 13
dimvalue
catalog_size34.0
chain_length3.0
decoy_count28.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on0.0
irreversibility0.0
parallel_goals1.0
plan_overhead0.0
poison_traps0.0
realized_plan_depth6.0
state_obscurity0.0
zero_slack_on0.0
Latent params 11
paramvalue
decoy_tools28.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on0.0
irreversibility0.0
parallel_goals1.0
plan_depth3.0
poison_traps0.0
precondition_chain1.0
state_obscurity0.0
zero_slack_on0.0