Data to …… trials

Record 5e7d1fffed5d48c191635cb163b810d0

PASS

Verdict and provenance first; raw prompt/response/reasoning below, collapsed.

✓PASSanswered "]" · model Nemotron 3 Nano 30B

finish_reason: stop · tokens in/out: 921/3442 · cost: $0.000734 · latency: 24633.8 ms

tool_plantemplatestop

verifier_detail: kind=tool_plan;campaign=1;traps=poison_traps=0;dishonest_decoys_on=1;implicit_preconditions_on=1;zero_slack_on=1;id_collisions_on=1;detail=goal_reached;n_calls=9;optimal_depth=9;overhead=0

trap kind(s) this world was seeded for: poison_traps=0

lineage: 5e7d1fff

← prev trial · trial 128 of 154 · next trial →

Prompt 3,561 chars · 921 tokens in
You are an operations planner. Below is the current state of a small deployment environment, a goal, and a catalog of tools you may call. Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails.
ENVIRONMENT MECHANICS (apply these general rules to the specific tools below -- individual tool descriptions do not restate them): a service can only be configured once it has been provisioned, can only be deployed once configured, and can only be health-checked once deployed -- i.e. each rung of the down -> provisioned -> configured -> deployed -> healthy ladder requires the previous rung. An artifact can only be published once it has been built. A flag can only be set while it is currently false, and some flags require another flag to already be set first. Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire. Read each tool's own description for which specific gate (if any) applies to it.

CURRENT STATE:
- gateway-0 is currently down (not yet provisioned).
- registry-1 is currently down (not yet provisioned).
- ledger-2 is currently down (not yet provisioned).
- The release-image artifact does not exist yet.
- The db-migration artifact does not exist yet.
- The maintenance_window_open flag is off.
- The secrets_synced flag is off.

GOAL (all conditions must hold at the end):
- service 'gateway-0' must reach at least the 'deployed' state
- service 'registry-1' must reach at least the 'configured' state

ENTITY IDS (use these exact ids in your tool args):
Services: svc_0 (gateway-0), svc_1 (registry-1), svc_2 (ledger-2)
Artifacts: art_0 (release-image), art_1 (db-migration)
Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced), flag_interleave_2 (interleave_window)

TOOL CATALOG:
- id: dec-oy_1 | name: confirm_service_target | params: service: service
    Confirms gateway-0 is tracking toward the required goal state.
- id: decoy_o0 | name: stage_goal_gate | params: service: service
    Stages the gating condition gateway-0 needs to reach the goal.
- id: build_art_o0 | name: build_artifact | params: artifact: artifact
    Build the art_0 artifact (moves it from 'absent' to 'built').
- id: advance_o0 | name: provision | params: service: service
    Provision a service, moving it from 'down' to 'provisioned'.
- id: publis-h_art_0 | name: publish_artifact | params: artifact: artifact
    Publish the art_0 artifact (moves it from 'built' to 'published').
- id: set_-flag_0 | name: set_flag | params: flag: flag
    Set the flag_0 flag to true.
- id: advance_o2 | name: deploy | params: service: service
    Deploy a service, moving it from 'configured' to 'deployed'. Requires the flag_0 flag to be set. Requires the art_0 artifact to be published. Requires the flag_interleave_2 window flag to be open.
- id: advance_o1 | name: configure | params: service: service
    Configure a service, moving it from 'provisioned' to 'configured'. Requires the flag_interleave_2 window flag to be open.
- id: open_interleave_window | name: open_interleave_window | params: (no args)
    Open the shared interleave window flag.

Output ONLY a JSON array of tool calls that, executed in order from the current state, satisfies the goal. Each element must be an object {"tool": "<tool id>", "args": {"<param>": "<entity id>", ...}}. Do not include any prose, explanation, or markdown fences -- just the JSON array.

You may use at most 9 tool calls.
Response 3,442 tokens out · finish: stop
[
  {"tool":"open_interleave_window","args":{}},
  {"tool":"set_-flag_0","args":{"flag":"flag_0"}},
  {"tool":"build_art_o0","args":{"artifact":"art_0"}},
  {"tool":"publis-h_art_0","args":{"artifact":"art_0"}},
  {"tool":"advance_o0","args":{"service":"svc_0"}},
  {"tool":"advance_o0","args":{"service":"svc_1"}},
  {"tool":"advance_o1","args":{"service":"svc_0"}},
  {"tool":"advance_o1","args":{"service":"svc_1"}},
  {"tool":"advance_o2","args":{"service":"svc_0"}}
]
Reasoning 12,524 chars
Model reasoning
We need to produce a JSON array of tool calls that satisfy the goal: gateway-0 must reach at least 'deployed' state, registry-1 must reach at least 'configured' state.

Current state: all services down (not provisioned). release-image artifact does not exist. db-migration artifact does not exist. maintenance_window_open flag is off. secrets_synced flag is off. flag_interleave_2 is not mentioned but presumably exists; we need to set it? It may need to be open for certain steps.

We have tools:

- confirm_service_target (dec-oy_1) params: service: service. This "Confirms gateway-0 is tracking toward the required goal state." Not sure what it does; maybe just a no-op? It likely checks something? But we can use it maybe to confirm after deployment? Not needed for planning.

- stage_goal_gate (decoy_o0) params: service: service. Stages the gating condition gateway-0 needs to reach the goal.

- build_artifact (build_art_o0) params: artifact: artifact. Build artifact (art_0). So we need to build release-image (art_0) and db-migration (art_1). But only build_artifact tool is for building artifact; maybe we can build both? It takes artifact param; we can call it twice.

- publish_artifact (publis-h_art_0) params: artifact: artifact. Publish artifact (art_0). So after building, we can publish.

- set_flag (set_-flag_0) params: flag: flag. Set flag_0 (maintenance_window_open) to true.

- deploy (advance_o2) params: service: service. Deploy a service, moving from configured to deployed. Requires flag_0 flag to be set, art_0 artifact published, and flag_interleave_2 window flag to be open.

- configure (advance_o1) params: service: service. Configure a service, moving from provisioned to configured. Requires flag_interleave_2 window flag to be open.

- open_interleave_window (open_interleave_window) no args. Opens the shared interleave window flag.

We also have flags: flag_interleave_2 (interleave_window). It can be opened via open_interleave_window. It can only be set while currently false? Probably can be opened only once? Not sure.

Goal: gateway-0 must reach at least 'deployed' state. That means we need to provision it, configure it, then deploy it. Provision moves from down to provisioned. Configure moves from provisioned to configured. Deploy moves from configured to deployed. So we need to do provision, configure, deploy for svc_0 (gateway-0). For registry-1 (svc_1), we need at least 'configured' state, which means provision then configure. So we need to provision and configure svc_1.

Constraints: Deploy requires flag_0 set, art_0 published, and flag_interleave_2 open. Configure requires flag_interleave_2 open. Provision does not have extra requirements (just from down to provisioned). Build artifact builds artifact (art_0). Publish artifact publishes art_0 (requires it to be built). So we need to build and publish art_0 before deploy.

Also we need to maybe set flag_0 (maintenance_window_open) to true before deploy. Also need flag_interleave_2 open before configure and deploy.

We also have stage_goal_gate (decoy_o0) which "Stages the gating condition gateway-0 needs to reach the goal." Not sure what it does; maybe it sets some internal state that is required for something else? Might be needed to satisfy some precondition? The description: "Stages the gating condition gateway-0 needs to reach the goal." Possibly it's a prerequisite for something else? Not sure. But maybe it's needed to "confirm_service_target"? Actually confirm_service_target is "Confirms gateway-0 is tracking toward the required goal state." Might be used after we have done something? Not needed for planning maybe.

We have at most 9 tool calls.

We need to output JSON array of tool calls in order.

Plan:

We need to open interleave window first? Because configure and deploy require it open. So we can call open_interleave_window.

Then we need to set flag_0 (maintenance_window_open) to true. That can be done anytime when flag is currently false. So call set_-flag_0 with flag: flag_0.

But deploy also requires art_0 published. So we need to build artifact art_0, then publish it. Build artifact: build_art_o0 with artifact: art_0. Then publish_artifact with artifact: art_0.

We also need to provision services. Provision svc_0 and svc_1. Provision moves from down to provisioned. So call advance_o0 (provision) with service: svc_0. Then call advance_o0? Actually the tool id is "advance_o0" with param service: service. That is provision. So we can call it for svc_0 and svc_1.

Then configure services: configure (advance_o1) with service: svc_0 and service: svc_1. But configure requires flag_interleave_2 open, which we already opened.

Then deploy gateway-0: deploy (advance_o2) with service: svc_0. This requires flag_0 set, art_0 published, flag_interleave_2 open. So after we have set flag_0, built and published art_0, and opened interleave window, we can deploy.

We also might need to "stage_goal_gate" or "confirm_service_target"? Not sure if needed. The goal is to reach deployed and configured states. The tools may be needed to satisfy some hidden precondition. Let's examine each tool's description:

- confirm_service_target: "Confirms gateway-0 is tracking toward the required goal state." Might be a no-op that just checks? Possibly it must be called after we have staged the goal? Not sure.

- stage_goal_gate: "Stages the gating condition gateway-0 needs to reach the goal." Might be required before we can deploy? Maybe it sets some internal flag that is required for deploy? But not mentioned in deploy preconditions. Deploy requires flag_0, art_0 published, flag_interleave_2 open. So stage_goal_gate may not be required.

But maybe the "gate" is something like a condition that must be staged before we can proceed with certain steps. The description: "Stages the gating condition gateway-0 needs to reach the goal." Could be a prerequisite for "confirm_service_target"? Not sure.

Given the instructions: "Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails." So we must ensure we only call tools when their preconditions are satisfied.

We need to check preconditions for each tool. The tool descriptions do not list explicit preconditions, but the general rules: a service can only be configured once it has been provisioned, can only be deployed once configured, and can only be health-checked once deployed. That's general. Also artifact can only be published once it has been built. A flag can only be set while it is currently false, and some flags require another flag to already be set first. Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire.

Thus, for each tool we need to ensure its preconditions are met.

Let's list tools with their preconditions:

- confirm_service_target (dec-oy_1) params: service: service. Probably no preconditions? Might just confirm something; maybe it requires the service to be in some state? Not sure. But likely it can be called anytime? Might require the service to be provisioned? Not sure. But it's not needed for goal.

- stage_goal_gate (decoy_o0) params: service: service. Might require something? Possibly requires the service to be provisioned? Not sure.

- build_artifact (build_art_o0) params: artifact: artifact. Precondition: artifact does not exist yet (absent). So we can build it when it's absent. That's fine.

- publish_artifact (publis-h_art_0) params: artifact: artifact. Precondition: artifact must be built (published moves from built to published). So after building, we can publish.

- set_flag (set_-flag_0) params: flag: flag. Precondition: flag must be currently false, and maybe some flags require another flag to be set first? For flag_0, no mention of requiring other flags. So we can set it when false.

- advance_o2 (deploy) params: service: service. Preconditions: service must be configured (i.e., in configured state). Also flag_0 must be set, artifact_0 must be published, flag_interleave_2 must be open.

- advance_o1 (configure) params: service: service. Precondition: service must be provisioned, and flag_interleave_2 must be open.

- open_interleave_window (open_interleave_window) no args. Precondition: flag_interleave_2 must be currently false? It says "Open the shared interleave window flag." Probably can be called when it's closed (false). So we can open it.

Thus plan:

1. open_interleave_window (no args) -> opens flag_interleave_2.

2. set_-flag_0 (flag: flag_0) -> sets maintenance_window_open to true.

3. build_artifact (artifact: art_0) -> builds release-image.

4. publish_artifact (artifact: art_0) -> publishes it.

5. provision svc_0 (advance_o0 service: svc_0) -> moves gateway-0 from down to provisioned.

6. provision svc_1 (advance_o0 service: svc_1) -> moves registry-1 from down to provisioned.

7. configure svc_0 (advance_o1 service: svc_0) -> moves gateway-0 from provisioned to configured. (requires flag_interleave_2 open, which we have)

8. configure svc_1 (advance_o1 service: svc_1) -> moves registry-1 from provisioned to configured.

9. deploy svc_0 (advance_o2 service: svc_0) -> moves gateway-0 from configured to deployed. (requires flag_0 set, art_0 published, flag_interleave_2 open)

Now we have gateway-0 deployed, registry-1 configured. Goal satisfied.

We used 9 tool calls? Let's count: open_interleave_window (1), set_-flag_0 (2), build_artifact (3), publish_artifact (4), provision svc_0 (5), provision svc_1 (6), configure svc_0 (7), configure svc_1 (8), deploy svc_0 (9). That's exactly 9 calls, which is the max allowed. So we are at limit, okay.

We need to output JSON array of objects with "tool" and "args". The tool IDs are given as:

- open_interleave_window (id: open_interleave_window) name: open_interleave_window. So tool id is "open_interleave_window". args: {} (no args). So object {"tool":"open_interleave_window","args":{}}.

- set_-flag_0 (id: set_-flag_0) name: set_flag. args: {"flag":"flag_0"}.

- build_artifact (id: build_art_o0) name: build_artifact. args: {"artifact":"art_0"}.

- publish_artifact (id: publis-h_art_0) name: publish_artifact. args: {"artifact":"art_0"}.

- advance_o0 (id: advance_o0) name: provision. args: {"service":"svc_0"} and later {"service":"svc_1"}.

- advance_o1 (id: advance_o1) name: configure. args: {"service":"svc_0"} and later {"service":"svc_1"}.

- advance_o2 (id: advance_o2) name: deploy. args: {"service":"svc_0"}.

Thus the JSON array should be in order:

1. {"tool":"open_interleave_window","args":{}}
2. {"tool":"set_-flag_0","args":{"flag":"flag_0"}}
3. {"tool":"build_art_o0","args":{"artifact":"art_0"}}
4. {"tool":"publis-h_art_0","args":{"artifact":"art_0"}}
5. {"tool":"advance_o0","args":{"service":"svc_0"}}
6. {"tool":"advance_o0","args":{"service":"svc_1"}}
7. {"tool":"advance_o1","args":{"service":"svc_0"}}
8. {"tool":"advance_o1","args":{"service":"svc_1"}}
9. {"tool":"advance_o2","args":{"service":"svc_0"}}

Check preconditions:

- open_interleave_window: flag_interleave_2 must be false (currently off). It is off, so okay.

- set_-flag_0: flag_0 must be currently false. It is off, so okay.

- build_artifact: artifact art_0 does not exist yet. It doesn't, so okay.

- publish_artifact: artifact must be built. After build, it is built, so okay.

- provision svc_0: service must be down (not provisioned). It is down, okay.

- provision svc_1: same.

- configure svc_0: service must be provisioned, and flag_interleave_2 open. It is provisioned now, and we opened interleave window, so okay.

- configure svc_1: same.

- deploy svc_0: service must be configured, flag_0 set, artifact_0 published, flag_interleave_2 open. All satisfied.

Thus plan works.

We must output only JSON array, no extra text. Ensure proper JSON formatting: an array of objects. Use double quotes. No trailing commas.

Thus final answer:

[
  {"tool":"open_interleave_window","args":{}},
  {"tool":"set_-flag_0","args":{"flag":"flag_0"}},
  {"tool":"build_art_o0","args":{"artifact":"art_0"}},
  {"tool":"publis-h_art_0","args":{"artifact":"art_0"}},
  {"tool":"advance_o0","args":{"service":"svc_0"}},
  {"tool":"advance_o0","args":{"service":"svc_1"}},
  {"tool":"advance_o1","args":{"service":"svc_0"}},
  {"tool":"advance_o1","args":{"service":"svc_1"}},
  {"tool":"advance_o2","args":{"service":"svc_0"}}
]

Make sure no extra whitespace? It's okay.

Now produce final.
Realized dims 13
dimvalue
catalog_size9.0
chain_length3.0
decoy_count2.0
dishonest_decoys_on1.0
id_collisions_on1.0
implicit_preconditions_on1.0
irreversibility0.0
parallel_goals2.0
plan_overhead0.0
poison_traps0.0
realized_plan_depth9.0
state_obscurity0.0
zero_slack_on1.0
Latent params 11
paramvalue
decoy_tools2.0
dishonest_decoys_on1.0
id_collisions_on1.0
implicit_preconditions_on1.0
irreversibility0.0
parallel_goals2.0
plan_depth3.0
poison_traps0.0
precondition_chain1.0
state_obscurity0.0
zero_slack_on1.0