Data to …… trials

Record 1ec989bf765c4ce6a78db0a56f88788d

PASS

Verdict and provenance first; raw prompt/response/reasoning below, collapsed.

✓PASSanswered "]" · model Nemotron 3 Nano 30B

finish_reason: stop · tokens in/out: 958/3121 · cost: $0.000672 · latency: 27772.0 ms

tool_plantemplatestop

verifier_detail: kind=tool_plan;campaign=1;traps=poison_traps=1;dishonest_decoys_on=1;implicit_preconditions_on=1;zero_slack_on=1;id_collisions_on=0;detail=goal_reached;n_calls=9;optimal_depth=9;overhead=0

trap kind(s) this world was seeded for: poison_traps=1

lineage: 1ec989bf

← prev trial · trial 93 of 154 · next trial →

Prompt 3,674 chars · 958 tokens in
You are an operations planner. Below is the current state of a small deployment environment, a goal, and a catalog of tools you may call. Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails.
ENVIRONMENT MECHANICS (apply these general rules to the specific tools below -- individual tool descriptions do not restate them): a service can only be configured once it has been provisioned, can only be deployed once configured, and can only be health-checked once deployed -- i.e. each rung of the down -> provisioned -> configured -> deployed -> healthy ladder requires the previous rung. An artifact can only be published once it has been built. A flag can only be set while it is currently false, and some flags require another flag to already be set first. Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire. Read each tool's own description for which specific gate (if any) applies to it.

CURRENT STATE:
- ledger-0 is currently down (not yet provisioned).
- ingest-1 is currently down (not yet provisioned).
- billing-2 is currently down (not yet provisioned).
- The release-image artifact does not exist yet.
- The db-migration artifact does not exist yet.
- The maintenance_window_open flag is off.
- The secrets_synced flag is off.

GOAL (all conditions must hold at the end):
- service 'ledger-0' must reach at least the 'deployed' state
- service 'ingest-1' must reach at least the 'configured' state

ENTITY IDS (use these exact ids in your tool args):
Services: svc_0 (ledger-0), svc_1 (ingest-1), svc_2 (billing-2)
Artifacts: art_0 (release-image), art_1 (db-migration)
Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced), flag_interleave_2 (interleave_window)

TOOL CATALOG:
- id: decoy_0 | name: verify_goal_readiness | params: service: service
    Confirms ledger-0 is ready to satisfy the current goal.
- id: poison_trap | name: sync_release_state | params: service: service
    Reconcile ledger-0's deployment metadata ahead of rollout.
- id: build_art_0 | name: build_artifact | params: artifact: artifact
    Build the art_0 artifact (moves it from 'absent' to 'built').
- id: decoy_1 | name: audit_rollout_plan | params: service: service
    Cross-checks ledger-0's rollout plan against the goal state.
- id: set_flag_0 | name: set_flag | params: flag: flag
    Set the flag_0 flag to true.
- id: publish_art_0 | name: publish_artifact | params: artifact: artifact
    Publish the art_0 artifact (moves it from 'built' to 'published').
- id: advance_0 | name: provision | params: service: service
    Provision a service, moving it from 'down' to 'provisioned'.
- id: advance_2 | name: deploy | params: service: service
    Deploy a service, moving it from 'configured' to 'deployed'. Requires the flag_0 flag to be set. Requires the art_0 artifact to be published. Requires the flag_interleave_2 window flag to be open.
- id: advance_1 | name: configure | params: service: service
    Configure a service, moving it from 'provisioned' to 'configured'. Requires the flag_interleave_2 window flag to be open.
- id: open_interleave_window | name: open_interleave_window | params: (no args)
    Open the shared interleave window flag.

Output ONLY a JSON array of tool calls that, executed in order from the current state, satisfies the goal. Each element must be an object {"tool": "<tool id>", "args": {"<param>": "<entity id>", ...}}. Do not include any prose, explanation, or markdown fences -- just the JSON array.

You may use at most 9 tool calls.
Response 3,121 tokens out · finish: stop
[
  {"tool":"build_art_0","args":{"artifact":"art_0"}},
  {"tool":"publish_art_0","args":{"artifact":"art_0"}},
  {"tool":"set_flag_0","args":{"flag":"flag_0"}},
  {"tool":"open_interleave_window","args":{}},
  {"tool":"advance_0","args":{"service":"svc_0"}},
  {"tool":"advance_0","args":{"service":"svc_1"}},
  {"tool":"advance_1","args":{"service":"svc_0"}},
  {"tool":"advance_1","args":{"service":"svc_1"}},
  {"tool":"advance_2","args":{"service":"svc_0"}}
]
Reasoning 11,115 chars
Model reasoning
We need to produce a JSON array of tool calls that will achieve the goal: ledger-0 must reach at least 'deployed' state, ingest-1 must reach at least 'configured' state.

Current state: ledger-0 down, ingest-1 down, billing-2 down. release-image artifact does not exist, db-migration artifact does not exist. maintenance_window_open flag is off. secrets_synced flag is off. Also there is flag_interleave_2 (interleave_window) but not mentioned as on/off; presumably it's off initially? It says flag_interleave_2 (interleave_window) is part of flags but not given current state; maybe it's off by default. We need to set flags appropriately.

Tool list:

- decoy_0: verify_goal_readiness(service) - checks readiness but not needed maybe.
- poison_trap: sync_release_state(service) - reconcile ledger-0's deployment metadata ahead of rollout. Might be needed before deployment? Not sure preconditions.
- build_art_0: build_artifact(artifact) - builds release-image artifact.
- decoy_1: audit_rollout_plan(service) - cross-checks rollout plan.
- set_flag_0: set_flag(flag) - set maintenance_window_open flag to true.
- publish_art_0: publish_artifact(artifact) - publish release-image artifact (needs built).
- advance_0: provision(service) - provision ledger-0 (down -> provisioned). No preconditions? Probably just provision.
- advance_1: configure(service) - configure ingest-1 (provisioned -> configured). Requires flag_interleave_2 open.
- advance_2: deploy(service) - deploy ledger-0 (configured -> deployed). Requires flag_0 (maintenance_window_open) set, art_0 published, flag_interleave_2 open.
- open_interleave_window: open_interleave_window() - opens flag_interleave_2.

We need to produce a sequence of at most 9 tool calls that satisfies goal.

Goal: ledger-0 must reach at least 'deployed' state. That means we need to provision, configure? Actually ledger-0 is a service; to deploy it, we need to go down -> provisioned -> configured -> deployed. But the goal only requires at least 'deployed' state, which is the final rung. So we need to provision, configure, deploy? Actually the ladder: down -> provisioned -> configured -> deployed -> healthy. So to reach deployed, we need to provision, then configure, then deploy. However, the tool 'configure' is for a service? It says configure moves from provisioned to configured. It requires flag_interleave_2 open. So we need to open that window before configuring any service that needs it. Both ledger-0 and ingest-1 may need it? The description: advance_1 (configure) requires flag_interleave_2 window flag to be open. It doesn't say it's specific to which service; probably any configure call requires it. So we need to open_interleave_window before calling configure for ingest-1 (or maybe also for ledger-0 if we need to configure it before deploying). But we might not need to configure ledger-0 before deploying? Actually to deploy, we need to be configured first (configured -> deployed). So we need to configure ledger-0 as well. So we need to configure ledger-0 (svc_0) as part of its path to deployed. That also requires flag_interleave_2 open. So we need to open that window before configuring either service.

Thus steps:

1. Build artifact art_0 (release-image). Use build_art_0 with artifact art_0.

2. Publish artifact art_0 (publish_artifact) with artifact art_0. This requires artifact built.

3. Set flag_0 (maintenance_window_open) to true. Use set_flag_0 with flag flag_0.

4. Open interleave window: open_interleave_window (no args). This sets flag_interleave_2 to true.

Now we can proceed to provision services.

5. Provision ledger-0: advance_0 with service svc_0.

6. Configure ledger-0: advance_1 with service svc_0. This requires flag_interleave_2 open, which we have.

7. Deploy ledger-0: advance_2 with service svc_0. This requires flag_0 (maintenance_window_open) set, art_0 published, flag_interleave_2 open. All satisfied.

Now ingest-1 must reach at least 'configured' state. That means we need to provision ingest-1 (down -> provisioned) then configure ingest-1 (provisioned -> configured). Provisioning does not have preconditions? It just moves from down to provisioned. So we can provision ingest-1 after maybe some other steps? There's no requirement for artifact or flag for provision. So we can provision ingest-1 at any time after maybe we have opened interleave window? Actually provision does not require any flag. So we can provision ingest-1 after step 5 maybe before configuring ledger-0? But we need to ensure we have enough tool calls (<=9). Let's count.

We have already 7 steps (build, publish, set_flag, open_interleave, provision ledger, configure ledger, deploy ledger). That's 7. We still need to provision ingest-1 and configure ingest-1. That's two more steps, making total 9. That's okay (max 9). However, we need to ensure that configure ingest-1 also requires flag_interleave_2 open, which we already opened. So we can configure ingest-1 after provisioning it.

But we also need to consider that we might need to configure ingest-1 before deploying ledger-0? Not necessarily; the order can be interleaved. However, we must ensure that when we call configure ingest-1, the flag_interleave_2 is still open (it remains open). There's no tool to close it, so it's fine.

But we also need to consider that we might need to provision ingest-1 before we can configure it. So we need a provision step for ingest-1 (advance_0 with service svc_1). That is a separate tool call.

Thus total steps: build_art_0, publish_art_0, set_flag_0, open_interleave_window, provision svc_0, configure svc_0, deploy svc_0, provision svc_1, configure svc_1. That's 9 calls exactly.

But we also need to consider that we might need to verify goal readiness? Not required. The goal is to satisfy conditions; we can just execute the necessary steps.

Check preconditions for each tool:

- build_art_0: builds artifact; no preconditions mentioned. So can call.

- publish_art_0: requires artifact built. After build, we can publish.

- set_flag_0: sets flag_0 to true; can only set while currently false. Initially it's off, so okay.

- open_interleave_window: opens flag_interleave_2; no preconditions; can call.

- advance_0 (provision): moves from down to provisioned; no preconditions mentioned.

- advance_1 (configure): requires flag_interleave_2 open. We will have opened it before calling configure. So we must call open_interleave_window before configure calls.

- advance_2 (deploy): requires flag_0 set, art_0 published, flag_interleave_2 open. We'll have all three satisfied before calling deploy.

Thus ordering must respect these dependencies.

Potential sequence:

1. build_art_0 (artifact art_0)
2. publish_art_0 (artifact art_0)
3. set_flag_0 (flag flag_0)
4. open_interleave_window ()
5. provision svc_0 (service svc_0)
6. provision svc_1 (service svc_1)   <-- we can provision ingest-1 now
7. configure svc_0 (service svc_0)   <-- requires flag_interleave_2 open (yes)
8. configure svc_1 (service svc_1)   <-- also requires flag_interleave_2 open (yes)
9. deploy svc_0 (service svc_0)      <-- requires flag_0 set (yes), art_0 published (yes), flag_interleave_2 open (yes)

But note: deploy requires service to be configured first. We have configured svc_0 at step 7, so okay. Also we need to ensure that we have configured svc_0 before deploying. That's fine.

But we also need to ensure that we have configured svc_1? Not required for goal; only need ingest-1 to reach at least configured. So we need to configure svc_1. That's step 8.

Now check that we haven't exceeded 9 calls: we have 9 calls exactly.

But we need to ensure that the ordering respects that configure calls require flag_interleave_2 open, which we opened at step 4, so both configure calls are okay.

Now check that deploy requires flag_interleave_2 open; we have it open.

Now check that deploy also requires art_0 published; we published at step 2.

Now check that deploy requires flag_0 set; we set at step 3.

Thus all preconditions satisfied.

Now check that we didn't need to call decoy_0 or decoy_1 or poison_trap or audit_rollout_plan. Not required.

Thus the JSON array should contain 9 objects with tool ids and args.

Let's map each tool id to the appropriate call:

- build_art_0: id "build_art_0", args: {"artifact": "art_0"}

- publish_art_0: id "publish_artifact", args: {"artifact": "art_0"} (note tool id is "publish_artifact"? Actually catalog says id: publish_art_0 | name: publish_artifact | params: artifact: artifact. So the tool id is "publish_art_0"? The catalog lists each tool with an "id". The id is the first field: "id: decoy_0 | name: verify_goal_readiness | params: service: service". So the id is "decoy_0". So for publish_artifact, the id is "publish_art_0". Indeed the catalog: "- id: publish_art_0 | name: publish_artifact | params: artifact: artifact". So we should use "publish_art_0" as the tool id.

Similarly, set_flag_0 id is "set_flag_0". open_interleave_window id is "open_interleave_window". advance_0 id is "advance_0". advance_1 id is "advance_1". advance_2 id is "advance_2". build_art_0 id is "build_art_0". So we need to use those ids.

Thus the sequence:

1. {"tool":"build_art_0","args":{"artifact":"art_0"}}

2. {"tool":"publish_art_0","args":{"artifact":"art_0"}}

3. {"tool":"set_flag_0","args":{"flag":"flag_0"}}

4. {"tool":"open_interleave_window","args":{}} (no args)

5. {"tool":"advance_0","args":{"service":"svc_0"}} (provision ledger-0)

6. {"tool":"advance_0","args":{"service":"svc_1"}} (provision ingest-1)

7. {"tool":"advance_1","args":{"service":"svc_0"}} (configure ledger-0)

8. {"tool":"advance_1","args":{"service":"svc_1"}} (configure ingest-1)

9. {"tool":"advance_2","args":{"service":"svc_0"}} (deploy ledger-0)

Check that we didn't exceed 9 calls: exactly 9.

Now ensure that the ordering respects that configure calls require flag_interleave_2 open, which we opened at step 4, so okay.

Now check that deploy requires flag_interleave_2 open; we have it open.

Now check that deploy also requires flag_0 set; we set at step 3.

Now check that deploy also requires art_0 published; we published at step 2.

Thus all good.

Now produce JSON array of these objects, no extra text.

Make sure to use double quotes and proper JSON.

Thus final answer:

[
  {"tool":"build_art_0","args":{"artifact":"art_0"}},
  {"tool":"publish_art_0","args":{"artifact":"art_0"}},
  {"tool":"set_flag_0","args":{"flag":"flag_0"}},
  {"tool":"open_interleave_window","args":{}},
  {"tool":"advance_0","args":{"service":"svc_0"}},
  {"tool":"advance_0","args":{"service":"svc_1"}},
  {"tool":"advance_1","args":{"service":"svc_0"}},
  {"tool":"advance_1","args":{"service":"svc_1"}},
  {"tool":"advance_2","args":{"service":"svc_0"}}
]

Check that we used correct ids: "publish_art_0" is correct. "set_flag_0" correct. "open_interleave_window" correct. "advance_0" correct. "advance_1" correct. "advance_2" correct. "build_art_0" correct.

Now ensure that we didn't need to include any other tool calls like decoy_0 etc. Not needed.

Thus final output is just that JSON array.
Realized dims 13
dimvalue
catalog_size10.0
chain_length3.0
decoy_count2.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on1.0
irreversibility1.0
parallel_goals2.0
plan_overhead0.0
poison_traps1.0
realized_plan_depth9.0
state_obscurity0.0
zero_slack_on1.0
Latent params 11
paramvalue
decoy_tools2.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on1.0
irreversibility0.0
parallel_goals2.0
plan_depth3.0
poison_traps1.0
precondition_chain1.0
state_obscurity0.0
zero_slack_on1.0