Data to …… trials

Record 18f9285bd6564ff0ba57d318c5172cfc

ERROR

Verdict and provenance first; raw prompt/response/reasoning below, collapsed.

✕ERRORlength · model Nemotron 3 Nano 30B

finish_reason: length · tokens in/out: 827/4000 · cost: $0.000841 · latency: 34225.1 ms

tool_plantemplatelength

verifier_detail: kind=tool_plan;campaign=1;traps=poison_traps=1;dishonest_decoys_on=1;implicit_preconditions_on=1;zero_slack_on=0;id_collisions_on=0;detail=malformed_plan:empty_response;n_calls=0;optimal_depth=4;overhead=-1;cap_hit=1;retry_exhausted=1

trap kind(s) this world was seeded for: poison_traps=1

lineage: 18f9285b

← prev trial · trial 6 of 20 · next trial →

Prompt 3,265 chars · 827 tokens in
You are an operations planner. Below is the current state of a small deployment environment, a goal, and a catalog of tools you may call. Each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error and your plan fails.
ENVIRONMENT MECHANICS (apply these general rules to the specific tools below -- individual tool descriptions do not restate them): a service can only be configured once it has been provisioned, can only be deployed once configured, and can only be health-checked once deployed -- i.e. each rung of the down -> provisioned -> configured -> deployed -> healthy ladder requires the previous rung. An artifact can only be published once it has been built. A flag can only be set while it is currently false, and some flags require another flag to already be set first. Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire. Read each tool's own description for which specific gate (if any) applies to it.

CURRENT STATE:
- At the end of last week, ledger-1 was fully torn down and has not been touched since.
- The db-migration artifact does not exist yet.
- The maintenance_window_open flag is off.
- scheduler-0 is currently down (not yet provisioned).
- The secrets_synced flag is off.
- The release-image artifact does not exist yet.

GOAL (all conditions must hold at the end):
- service 'scheduler-0' must reach at least the 'healthy' state

ENTITY IDS (use these exact ids in your tool args):
Services: svc_0 (scheduler-0), svc_1 (ledger-1)
Artifacts: art_0 (release-image), art_1 (db-migration)
Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced)

TOOL CATALOG:
- id: decoy_2 | name: stage_goal_gate | params: service: service
    Stages the gating condition scheduler-0 needs to reach the goal.
- id: decoy_3 | name: sync_release_state | params: service: service
    Reconciles scheduler-0's deployment metadata before rollout.
- id: advance_1 | name: configure | params: service: service
    Configure a service, moving it from 'provisioned' to 'configured'.
- id: poison_trap | name: sync_release_state | params: service: service
    Reconcile scheduler-0's deployment metadata ahead of rollout.
- id: advance_0 | name: provision | params: service: service
    Provision a service, moving it from 'down' to 'provisioned'.
- id: advance_3 | name: health-check | params: service: service
    Health-check a service, moving it from 'deployed' to 'healthy'.
- id: advance_2 | name: deploy | params: service: service
    Deploy a service, moving it from 'configured' to 'deployed'.
- id: decoy_1 | name: stage_goal_gate | params: service: service
    Stages the gating condition scheduler-0 needs to reach the goal.
- id: decoy_0 | name: stage_goal_gate | params: service: service
    Stages the gating condition scheduler-0 needs to reach the goal.

Output ONLY a JSON array of tool calls that, executed in order from the current state, satisfies the goal. Each element must be an object {"tool": "<tool id>", "args": {"<param>": "<entity id>", ...}}. Do not include any prose, explanation, or markdown fences -- just the JSON array.

You may use at most 8 tool calls.
Response 4,000 tokens out · finish: length
Reasoning 17,480 chars
Model reasoning
We need to produce a JSON array of tool calls that will achieve the goal: scheduler-0 must reach at least healthy state. Use exact entity ids: service svc_0 (scheduler-0). Artifacts: art_0 (release-image), art_1 (db-migration). Flags: flag_0 (maintenance_window_open), flag_1 (secrets_synced). Current state: ledger-1 fully torn down and not touched since. db-migration artifact does not exist yet. maintenance_window_open flag is off. scheduler-0 is currently down (not yet provisioned). secrets_synced flag is off. release-image artifact does not exist yet.

We need to follow tool preconditions. Let's list tools with their preconditions (from description). Tools:

- decoy_2 | name: stage_goal_gate | params: service: service
- decoy_3 | name: sync_release_state | params: service: service
- advance_1 | name: configure | params: service: service
- poison_trap | name: sync_release_state | params: service: service
- advance_0 | name: provision | params: service: service
- advance_3 | name: health-check | params: service: service
- advance_2 | name: deploy | params: service: service
- decoy_1 | name: stage_goal_gate | params: service: service
- decoy_0 | name: stage_goal_gate | params: service: service

But note some tools have same name but different id; they are distinct. We need to use correct ids.

We need to understand preconditions for each tool. The problem says each tool has typed parameters and PRECONDITIONS that must hold at the moment you call it; calling a tool whose preconditions are not met is an error. The environment mechanics: a service can only be configured once it has been provisioned, can only be deployed once configured, and can only be health-checked once deployed. So for advance_1 (configure) precondition: service must be provisioned. For advance_2 (deploy) precondition: service must be configured. For advance_3 (health-check) precondition: service must be deployed. Also there may be additional preconditions specific to each tool (like flags or artifacts). The description says "Read each tool's own description for which specific gate (if any) applies to it." So we need to infer from tool names and maybe their description? Not given explicitly, but we can deduce typical preconditions.

Let's parse each tool:

- decoy_2 | name: stage_goal_gate | params: service: service
Probably used to stage a gating condition; maybe requires some flag or artifact? Not sure. Might require that some flag is set? Not sure.

- decoy_3 | name: sync_release_state | params: service: service
Probably requires release-image artifact published? Or maybe requires secrets_synced flag? Not sure.

- advance_1 | name: configure | params: service: service
Precondition: service must be provisioned. Also maybe requires some flag? Not sure.

- poison_trap | name: sync_release_state | params: service: service
Probably same as decoy_3 but maybe different precondition? Not sure.

- advance_0 | name: provision | params: service: service
Precondition: service must be down? Actually provision moves from down to provisioned, so precondition likely that service is down (not provisioned). So service must be down (i.e., not provisioned). That's the starting state: scheduler-0 is down.

- advance_3 | name: health-check | params: service: service
Precondition: service must be deployed. Also maybe requires some flag? Not sure.

- advance_2 | name: deploy | params: service: service
Precondition: service must be configured.

- decoy_1 | name: stage_goal_gate | params: service: service
Probably similar to decoy_2.

- decoy_0 | name: stage_goal_gate | params: service: service

We need to produce a plan of at most 8 tool calls that ends with scheduler-0 healthy.

We need to consider the flags and artifacts requirements. The goal likely requires some flags to be set before certain steps. The description says: "Some flags require another flag to already be set first. Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire." So each tool may have specific preconditions like "requires flag_0 to be true" or "requires artifact art_0 published". We need to figure out which tools require what.

We have flags: maintenance_window_open (flag_0) is off. secrets_synced (flag_1) is off.

Artifacts: release-image (art_0) does not exist yet. db-migration (art_1) does not exist yet.

We need to publish artifacts before they can be used. There is no explicit "publish" tool listed, but maybe "sync_release_state" or "stage_goal_gate" require artifact to be published? Or maybe "advance_1" requires artifact? Not sure.

We need to infer from tool names: "sync_release_state" maybe synchronizes release state, maybe requires release-image artifact to be published? "stage_goal_gate" maybe stages a gating condition that might require a flag to be set.

Given the environment mechanics, we need to move scheduler-0 through down -> provisioned -> configured -> deployed -> healthy. So we need to call:

1. provision (advance_0) on svc_0 (scheduler-0). Precondition: service is down (which it is). So we can call advance_0 with service: svc_0.

2. configure (advance_1) on svc_0. Precondition: service is provisioned (after step 1). So we can call advance_1 with service: svc_0.

3. deploy (advance_2) on svc_0. Precondition: service is configured (after step 2). So we can call advance_2 with service: svc_0.

4. health-check (advance_3) on svc_0. Precondition: service is deployed (after step 3). So we can call advance_3 with service: svc_0.

That would achieve healthy state. However, there may be additional preconditions like flags or artifacts that must be satisfied before these steps can be executed. The problem likely expects us to set flags or publish artifacts before proceeding.

Let's examine the flags: maintenance_window_open (flag_0) is off. secrets_synced (flag_1) is off. Some advance steps may require a specific flag to be set. Which steps? Possibly "configure" or "deploy" or "health-check" might require maintenance_window_open flag to be true? Or maybe "stage_goal_gate" requires that flag? Or "sync_release_state" might require secrets_synced flag? Let's think.

The goal is to get scheduler-0 healthy. The environment may have a maintenance window that must be open to allow deployment. So maybe "deploy" or "configure" requires maintenance_window_open flag to be true. Or maybe "health-check" requires secrets_synced flag to be true (maybe secrets need to be synced before health check). Or maybe "stage_goal_gate" requires that flag to be set.

The problem statement: "Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire." So some of the advance steps (maybe configure, deploy, health-check) have additional gates. Which ones? Not specified, but we can guess based on typical patterns: maybe "configure" requires maintenance_window_open flag to be true, because you can only configure during maintenance window. Or "deploy" might require release-image artifact to be published. Or "health-check" might require secrets_synced flag to be true.

We need to examine the tool names for clues: "sync_release_state" maybe synchronizes release state, maybe requires release-image artifact to be published. "stage_goal_gate" maybe stages a gating condition for the goal; maybe it requires a flag to be set.

The decoy tools (decoy_2, decoy_1, decoy_0) are also "stage_goal_gate". They might be used to stage the gating condition for the goal, perhaps requiring some flag or artifact.

The problem likely expects a plan that includes publishing the db-migration artifact (art_1) and release-image artifact (art_0) before some steps. But we have no tool to publish artifacts; maybe "sync_release_state" or "stage_goal_gate" triggers publishing? Or maybe there is an implicit step that artifact must be built before it can be used; but we have no tool to build. However, we can maybe "publish" an artifact by calling a tool that has param artifact? Not present. So maybe we don't need to publish artifacts; they are just prerequisites for some flags? Actually the flags are separate.

The current state: db-migration artifact does not exist yet. release-image artifact does not exist yet. So we may need to create them? There is no tool to create artifacts. Maybe we need to "publish" them using some tool not listed? But the tool catalog only includes the listed tools. So maybe we need to use "sync_release_state" or "stage_goal_gate" which may have precondition that the artifact exists. But we cannot satisfy that precondition because artifact does not exist. So maybe we need to first "publish" the artifact via some other means? Not given.

Maybe the artifact existence is not required for the plan; maybe it's just part of the environment state but not needed for scheduler-0 healthy. However, the goal may require that db-migration artifact be published? Not mentioned. The goal only says service scheduler-0 must reach at least healthy state. So we may not need to worry about artifacts. But the environment mechanics mention artifact can only be published once it has been built. But we have no tool to build or publish. So maybe we can ignore artifacts; they just sit as "does not exist yet" but we can still proceed.

But maybe some tool's precondition requires that artifact be published. For example, "sync_release_state" might require release-image artifact to be published. If that is the case, we cannot call it until we have the artifact. But we don't have a way to publish it. So maybe we need to use "decoy_0" or "decoy_1" or "decoy_2" which also stage goal gate; maybe they have different preconditions that do not require artifact. Or maybe "poison_trap" is also sync_release_state but maybe has different precondition.

We need to decide a plausible plan that respects preconditions. Since we don't know exact preconditions, we need to infer from typical patterns in such puzzles. Usually, there are gating conditions that require certain flags to be set before you can proceed with certain steps. The flags are maintenance_window_open (flag_0) and secrets_synced (flag_1). Perhaps the requirement is that before you can configure or deploy scheduler-0, you need to set maintenance_window_open flag (flag_0) to true. And maybe before you can health-check, you need secrets_synced flag to be true. Or maybe you need to set both flags before any advance step.

Let's think: The environment might be a maintenance window that needs to be open for any changes to services. So "configure", "deploy", "health-check" might all require maintenance_window_open flag to be true. The flag is currently off. So we need to turn it on. But there may be a precondition that another flag must be set first. For example, maybe secrets_synced must be true before maintenance_window_open can be set. Or maybe maintenance_window_open can be set directly (no precondition). The description: "Some flags require another flag to already be set first." So there may be a dependency between flags. Which one requires which? Not specified. Could be that secrets_synced must be true before maintenance_window_open can be set, or vice versa. We need to decide.

Maybe the typical scenario: secrets must be synced before you can open maintenance window (i.e., you need secrets_synced to be true before you can open maintenance window). Or maybe you need to open maintenance window before you can sync secrets? Not sure.

Alternatively, maybe "stage_goal_gate" requires that maintenance_window_open be true, because it's staging the gating condition for the goal. Or maybe "sync_release_state" requires secrets_synced flag to be true.

Given the limited info, we need to produce a valid plan that respects preconditions. Since we don't know exact preconditions, we can assume minimal preconditions: only the ladder rung preconditions (down->provisioned->configured->deployed->healthy) are required, and no additional flag/artifact preconditions are needed for the advance steps. However, the problem explicitly mentions flags and artifacts and that some advance steps require a specific flag or artifact before they may fire. So we must incorporate that.

Thus, we need to identify which tool has which additional precondition. Let's examine tool names again:

- decoy_2 | name: stage_goal_gate | params: service: service
- decoy_3 | name: sync_release_state | params: service: service
- advance_1 | name: configure | params: service: service
- poison_trap | name: sync_release_state | params: service: service
- advance_0 | name: provision | params: service: service
- advance_3 | name: health-check | params: service: service
- advance_2 | name: deploy | params: service: service
- decoy_1 | name: stage_goal_gate | params: service: service
- decoy_0 | name: stage_goal_gate | params: service: service

We have two "sync_release_state" tools: decoy_3 and poison_trap. They might have different preconditions. Perhaps "sync_release_state" (decoy_3) requires that the release-image artifact be published, while "poison_trap" (maybe a different name) does not? Or maybe "poison_trap" is a different tool that also syncs release state but maybe has different precondition.

The "stage_goal_gate" tools (decoy_2, decoy_1, decoy_0) might be used to stage the gating condition for the goal; maybe they require a flag to be set.

Given the naming, "stage_goal_gate" likely is used to stage a gating condition that must be satisfied before the goal can be reached. It might require that a flag be set (maybe maintenance_window_open) or that an artifact be published (maybe release-image). So we might need to call one of these to stage the gate, which may set some internal state that allows subsequent steps.

But the problem says: "Your goal is to produce a plan that satisfies the goal." It doesn't require us to use any particular tool; we can just call the necessary advance steps. However, we must respect preconditions. If we can call advance_0, advance_1, advance_2, advance_3 directly, we could just do those four calls and be done. That would be within 8 calls. But we need to check if any of those have additional preconditions that are not met.

The current state: scheduler-0 is down (not provisioned). So advance_0 (provision) can be called (precondition: service is down). No other precondition mentioned. So we can call advance_0 with svc_0.

After that, scheduler-0 becomes provisioned. Then we can call advance_1 (configure) with svc_0 (precondition: service is provisioned). That should be allowed.

After that, scheduler-0 becomes configured. Then we can call advance_2 (deploy) with svc_0 (precondition: service is configured). That should be allowed.

After that, scheduler-0 becomes deployed. Then we can call advance_3 (health-check) with svc_0 (precondition: service is deployed). That should be allowed.

Thus we would have 4 calls, achieving healthy state. However, we need to consider if any of these steps require flags or artifacts. The problem says "Some advance steps additionally require a specific flag to be set or a specific artifact to be published before they may fire." Which advance steps? Possibly "configure", "deploy", "health-check" might have such additional requirements. We need to identify which ones.

Maybe "configure" requires maintenance_window_open flag to be true. Or maybe "deploy" requires release-image artifact to be published. Or maybe "health-check" requires secrets_synced flag to be true. Let's hypothesize:

- configure may require maintenance_window_open flag to be true (makes sense: you can only configure during maintenance window). Since maintenance_window_open is currently off, we need to turn it on before we can configure. But turning on a flag may have preconditions: maybe secrets_synced must be true first. Or maybe you can just set it directly (but it must be currently false, and you can set it to true). The description: "A flag can only be set while it is currently false, and some flags require another flag to already be set first." So you can set a flag only if it's currently false, and some flags have additional preconditions (require another flag to be already set). So we can set maintenance_window_open to true if it's currently false, but maybe it requires another flag (like secrets_synced) to be true first. Or maybe it doesn't require any other flag; you can just set it.

Thus we might need to set maintenance_window_open flag before we can configure. Similarly, maybe "deploy" requires release-image artifact to be published. Since release-image artifact does not exist yet, we might need to publish it first. But we have no tool to publish artifacts. However, maybe "sync_release_state" or "stage_goal_gate" can cause the artifact to be considered published? Or maybe we can just ignore that requirement.

Alternatively, maybe "health-check" requires secrets_synced flag to be true. Since secrets_synced is currently off, we need to set it to true before health-check. That may require another flag to be set first.

Thus we might need to set flags before we can proceed with certain steps. Let's try to deduce a plausible sequence.

Given the environment mechanics, the typical flow might be:

1. Ensure maintenance_window_open flag is true (maybe required for any configuration or deployment).
2. Ensure secrets_synced flag is true (maybe required for health-check).
3. Provision scheduler-0.
4. Configure scheduler-0
Realized dims 12
dimvalue
catalog_size9.0
chain_length0.0
decoy_count4.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on1.0
irreversibility1.0
parallel_goals1.0
poison_traps1.0
realized_plan_depth4.0
state_obscurity0.16666666666666666
zero_slack_on0.0
Latent params 11
paramvalue
decoy_tools4.0
dishonest_decoys_on1.0
id_collisions_on0.0
implicit_preconditions_on1.0
irreversibility0.0
parallel_goals1.0
plan_depth5.0
poison_traps1.0
precondition_chain0.0
state_obscurity0.3820052555325048
zero_slack_on0.0