Cross-model atlas
Where each model breaks. Pick a query kind and a difficulty dimension; every model with campaign data is binned into the same difficulty buckets so the cells are directly comparable.
6
Models compared
8
Query kinds
79%
7,285/9,195
Campaign pass rate
143
Boundaries fitted
Difficulty dial aliasing onanswer sizedistractor fractionidentifier confusabilityinclusive range trap onlate binding onmax nestingmutable default onn closuresn live aliasesn statementsn variablesnegative modulo onshadowing ontrace lengthtraps onn foil matchesopaque literal onchain depthcritical path depthindex mathloop branchmisleading commentsneutral commentssign chainstack depthwhile onbug distancehidden inputsn bugsconditionevidence spanevidence turns
Pass rate by difficulty · Code trace / critical path depth
6 populated cells · 0 fitted frontier(s) in range · hover a cell for exact counts
Degradation curve · model vs. model
Summary · model x query kind
| model | query_kind | pass rate | n | total cost |
|---|---|---|---|---|
| Nemotron 3 Nano 30B | belief | 927 | $0.189034 | |
| Nemotron 3 Nano 30B | interactive | 133 | $0.774886 | |
| Nemotron 3 Nano 30B | order | 160 | $0.022909 | |
| Nemotron 3 Nano 30B | state | 90 | $0.014016 | |
| Nemotron 3 Nano 30B | tool_plan | 637 | $0.348336 | |
| Nemotron 3 Ultra 550B | belief | 316 | $0.815803 | |
| Nemotron 3 Ultra 550B | interactive | 10 | $0.432233 | |
| Nemotron 3 Ultra 550B | order | 80 | $0.085632 | |
| Nemotron 3 Ultra 550B | state | 30 | $0.043059 | |
| Nemotron 3 Ultra 550B | tool_plan | 291 | $1.094840 | |
| Gemma 4 31B QAT | belief | 898 | $0.028576 | |
| Gemma 4 31B QAT | code_repair | 72 | $0.036091 | |
| Gemma 4 31B QAT | code_trace | 823 | $0.201881 | |
| Gemma 4 31B QAT | interactive | 675 | $1.073585 | |
| Gemma 4 31B QAT | order | 209 | $0.008847 | |
| Gemma 4 31B QAT | repo_fix | 204 | $1.966217 | |
| Gemma 4 31B QAT | state | 124 | $0.004818 | |
| Gemma 4 31B QAT | tool_plan | 867 | $0.170132 | |
| Gemma 3 27B | belief | 307 | $0.007658 | |
| Gemma 3 27B | code_trace | 245 | $0.062598 | |
| Gemma 3 27B | interactive | 115 | $0.913870 | |
| Gemma 3 27B | order | 80 | $0.004680 | |
| Gemma 3 27B | state | 45 | $0.002148 | |
| Gemma 3 27B | tool_plan | 397 | $0.069666 | |
| gpt-oss-120b | belief | 202 | $0.046658 | |
| gpt-oss-120b | order | 80 | $0.015004 | |
| gpt-oss-120b | state | 60 | $0.025043 | |
| Nemotron 3 Super 120B | belief | 451 | $0.157160 | |
| Nemotron 3 Super 120B | interactive | 148 | $1.080437 | |
| Nemotron 3 Super 120B | order | 80 | $0.018572 | |
| Nemotron 3 Super 120B | state | 95 | $0.033380 | |
| Nemotron 3 Super 120B | tool_plan | 551 | $0.515123 |